Executive status update generator

Transforms raw project notes into a crisp, executive-ready status update structured around progress, risks, decisions needed, and next steps — with a one-line summary, RAG status, and clear owner/deadline callouts. Use…

download .md

Purpose

Convert messy project notes, standup dumps, and Slack fragments into a tight, scannable executive status update that leads with the headline, surfaces the risks and decisions leaders actually need to act on, and buries operational detail. Solves the recurring problem of leaders drowning in status noise while the one decision that needs their attention gets lost on line 40.

When to Use

Invoke this skill when the user asks to:

  • Turn raw project notes or meeting notes into an executive status update
  • Prepare a weekly or biweekly status report for the C-suite or leadership team
  • Write a steering committee or program review update
  • Draft a board pre-read summary for a project or initiative
  • Highlight risks and decisions needed for a senior audience
  • Compress a long operational update into something a busy executive will actually read

Inputs Required

Before starting, collect:

  • Raw notes: The unstructured source material — bullet dumps, meeting notes, standup summaries, Slack threads
  • Project/initiative name: What this update is about
  • Audience: Who reads it (CEO, CFO, exec team, steering committee, board)
  • Reporting period: The window this covers (e.g., "week of Mar 3" or "Q2 to date")
  • Overall status: Green / Amber / Red — or ask the AI to infer it from the notes
  • Decisions or asks pending: Anything the user knows needs leadership action
  • Prior update (optional): Last period's update, to show trajectory and delta

If overall status is not provided, infer a RAG rating from the notes and flag it as an inferred rating for the user to confirm.

Instructions

Step 1: Parse and Categorize the Raw Notes

Read every line of the raw notes and sort each item into one of five buckets. Discard anything that fits none of these — an executive update is defined by what it leaves out.

  • Progress: Things completed or advanced this period, tied to outcomes not activity
  • Risks/Issues: Threats to timeline, budget, scope, or quality — active issues and emerging risks
  • Decisions needed: Anything requiring leadership approval, tradeoff, or unblocking
  • Next steps: Committed actions for the coming period with owners
  • Noise: Operational detail, internal churn, routine work — excluded from the update

If an item is ambiguous, favor the higher-signal category (a slipping dependency is a risk, not progress).

Step 2: Write the One-Line Summary (BLUF)

Lead with a single sentence that answers "should I worry, and what do you need from me?" Bottom line up front.

  • State overall trajectory in plain language, not jargon
  • If there's a decision needed, name it in this line
  • Length: one sentence, maximum 25 words

Step 3: Assign and Justify RAG Status

State Green / Amber / Red with a one-line rationale. Apply these thresholds:

  • Green: On track for scope, timeline, and budget — no leadership action needed
  • Amber: A risk or slip is emerging; recoverable with attention or a decision
  • Red: Committed timeline, budget, or scope is at material risk; leadership action required now

Never rate Green if there is an open decision needed — an open ask is Amber at minimum.

Step 4: Build the Progress Section

  • 3–5 bullets, each phrased as an outcome ("Onboarding flow shipped, cutting activation time 40%") not a task ("worked on onboarding")
  • Lead with the most consequential win
  • Quantify wherever the notes support it — percentages, dates, dollar figures

Step 5: Build the Risks & Issues Section

For each risk (2–4 items, ranked by severity):

  • Risk statement: What could go wrong or is going wrong, in one line
  • Impact: What it threatens — timeline / budget / scope / quality
  • Mitigation: What's being done, or what's needed
  • Rank most severe first; do not list more than 4 — collapse minor items

Step 6: Build the Decisions Needed Section

This is the section executives read first. For each decision:

  • The decision: Framed as a clear question or choice, not a status
  • Options: 2–3 options with the tradeoff for each
  • Recommendation: Your recommended path, stated with conviction
  • Owner & deadline: Who must decide and by when If there are no decisions needed, state "No decisions required this period" explicitly — do not omit the section.

Step 7: Build Next Steps

  • 3–5 committed actions for the next period
  • Each with a named owner and a target date
  • Format: "[Action] — [Owner], by [Date]"

Step 8: Add Trajectory (if prior update provided)

One line noting the delta from last period — status change (e.g., "Moved from Amber to Green"), resolved risks, or newly emerged issues.

Output Format

  • Structure: One-line summary → RAG status → Progress → Risks & Issues → Decisions Needed → Next Steps → Trajectory (if applicable)
  • Length: 200–350 words total — an executive should read it in under 90 seconds
  • Format: Scannable structured document; short bullets, bolded labels, no dense paragraphs
  • Sections: Summary line, RAG status, Progress, Risks & Issues, Decisions Needed, Next Steps, and Trajectory when a prior update exists
  • Tone: Chief-of-staff crisp — declarative, quantified, zero hedging, zero filler; every line earns its place

Quality Checklist

Before delivering output, verify:

  • [ ] The one-line summary is a single sentence of 25 words or fewer and names any pending decision
  • [ ] RAG status is assigned with a one-line rationale, and is not Green if a decision is open
  • [ ] Progress bullets are phrased as outcomes, not activities, and quantified where the notes allow
  • [ ] Each risk has an impact and a mitigation — no bare risk statements
  • [ ] Every decision has options, a recommendation, an owner, and a deadline
  • [ ] Total length is 200–350 words and contains no bracket placeholders or unfilled variables

Notes

  • The value of this skill is subtraction — if the update is longer than the source notes, it has failed. Cut ruthlessly.
  • Executives scan for the ask. When a decision is needed, the one-line summary and the Decisions section must both surface it — never make a leader hunt.
  • When status is inferred rather than stated, always flag it so the user confirms before circulating.
  • If the raw notes contain no genuine risks or decisions, resist inventing them; a clean Green update with strong progress bullets is a valid and welcome outcome.

How to use this skill

This file is a Claude Code skill in Anthropic's standard format — markdown with YAML frontmatter at the top.

Installing in Claude Code:

  • ~/.claude/skills/<folder-name>/SKILL.md — auto-loads in every session anywhere on your machine (recommended for skills you'll use across multiple projects)
  • <your-project>/.claude/skills/<folder-name>/SKILL.md — auto-loads only when working in that project (recommended for project-specific skills)

Restart Claude Code or open a new session to register.

Using in Claude.ai, ChatGPT, Gemini, or other AI tools:

  1. Drag this file into a new chat, or copy and paste its contents
  2. Send your task or request as your next message — the AI will apply the skill where it fits