name: budget-variance-analyzer
description: "Transforms actual vs. budget figures into board-ready variance commentary — categorizing each variance by root cause (volume, price, timing, one-time, structural), quantifying drivers, flagging material items, and recommending management actions. Use when preparing monthly or quarterly variance analysis, writing FP&A commentary, explaining budget-to-actual gaps, or building the narrative for a management review deck."
argument-hint: "[actuals-vs-budget] [period]"
allowed-tools: ["Read"]
---

# Budget Variance Analyzer

## Purpose
Turn a raw actual-vs-budget table into structured, decision-ready variance commentary that isolates the true root cause of each material gap — not just the dollar difference — and hands FP&A a defensible narrative for the management review. Eliminates the "we spent more than planned" non-explanation that gets analysts sent back to their desks.

## When to Use
Invoke this skill when the user asks to:
- Analyze actual vs. budget (or actual vs. forecast) results for a period
- Write variance commentary or explanations for a management/board deck
- Explain why a line item came in over or under plan
- Categorize variances by root cause for a P&L or department budget
- Prepare the narrative section of a monthly or quarterly business review
- Identify which variances are material enough to require action

## Inputs Required
Before starting, collect:
- **Variance data**: Line items with actual, budget (or forecast), and variance — as a table, list, or pasted export
- **Period**: The reporting period (e.g., "May 2024," "Q2 FY25," "YTD through June")
- **Materiality threshold**: Dollar and/or percentage floor for what counts as material (default: ±5% AND ±$25K if not specified)
- **Statement type**: P&L, department expense budget, cost center, project budget, or cash flow
- **Known drivers**: Any context the analyst already has (e.g., "a large deal slipped," "we hired 3 late," "vendor price increase")
- **Favorable/unfavorable convention**: Whether over-budget spend is shown as positive or negative
- **Audience**: Who reads this — department head, CFO, board, or investors

If materiality threshold is missing, apply ±5% and ±$25K and state the assumption. If favorable/unfavorable convention is unclear, treat higher revenue and lower cost as favorable and note it.

## Instructions

### Step 1: Normalize and Rank the Data
Before analyzing, put every line item on the same footing:
- Recompute variance in both **dollars** and **percentage** for each line
- Standardize sign convention so **favorable = good** (revenue above plan, cost below plan) and label each item F or U
- Rank all line items by absolute dollar variance, largest first
- Flag every item that breaches the materiality threshold — these get full treatment; sub-threshold items are summarized in aggregate

### Step 2: Categorize Each Material Variance by Root Cause
For every material item, assign a primary root-cause category. Do not accept a variance without a category.

- **Volume/Activity** — the variance is driven by more or fewer units, transactions, headcount, or activity than planned (e.g., higher sales volume, more support tickets, delayed hires)
- **Price/Rate** — same volume, different rate: unit price, wage rate, vendor rate, FX, or discount level moved (e.g., vendor raised prices, average selling price fell)
- **Timing** — the spend or revenue is real but landed in a different period than budgeted; it will reverse or catch up (e.g., invoice slipped a month, project kickoff delayed, revenue recognized early)
- **One-Time/Non-Recurring** — a discrete event not expected to repeat (e.g., severance, legal settlement, one-off bonus, asset write-off)
- **Structural/Permanent** — a lasting change to the run rate that should be reflected in the forecast (e.g., permanent headcount add, new recurring subscription, pricing model change)
- **Budget/Planning Error** — the budget itself was wrong or built on a bad assumption (e.g., forgot annual license renewal, double-counted a cost)

Where a variance splits across categories, decompose it (e.g., "$180K U total: $120K volume from delayed hires, $60K timing from a slipped recruiter invoice").

### Step 3: Quantify the Drivers
For each material item, express the "why" in numbers the reader can trace:
- Isolate the dollar impact of each root cause within the line
- Where volume and price both moved, use a simple price/volume bridge: Volume impact = (Actual units − Budget units) × Budget rate; Rate impact = (Actual rate − Budget rate) × Actual units
- Tie the number back to a business event whenever context is available
- For timing items, state the expected reversal period so the reader knows it self-corrects

### Step 4: Assess Trend and Trajectory
Judge whether each material variance is a one-period blip or a developing pattern:
- Is this variance **new this period, worsening, or stable**?
- Does the root cause imply the **run rate is now different** (structural) versus a self-correcting timing gap?
- For unfavorable structural items, estimate the **annualized or full-year impact** if the trend holds

### Step 5: Recommend Management Actions
Translate diagnosis into a decision. For each material unfavorable variance and each significant favorable one, recommend one of:
- **Reforecast** — structural change; update the outlook to reflect the new run rate
- **Corrective action** — controllable overspend; specify the lever (renegotiate, pause, reallocate)
- **Monitor** — timing or minor; watch for reversal next period, no action yet
- **No action / accept** — one-time and closed, or favorable and sustainable

Be specific about the lever — "reduce spend" is not an action; "renegotiate the software contract at renewal in Q3, estimated $40K annual savings" is.

### Step 6: Write the Executive Summary
Open with a 3–5 sentence headline the audience can read in isolation: net variance for the period (favorable/unfavorable), the two or three biggest drivers, and whether the full-year outlook is at risk. Lead with the story, not the spreadsheet.

## Output Format
- **Structure**: Executive summary first, then a material-variance table, then per-item commentary blocks, then a recommended-actions list
- **Length**: 700–1,100 words, scaling with the number of material line items
- **Format**: Prose executive summary + table for the variance overview + short structured commentary blocks per material item
- **Sections**:
  1. **Executive Summary** — net result and top drivers in plain language
  2. **Material Variance Table** — line item | actual | budget | $ var | % var | F/U | root cause
  3. **Variance Commentary** — one block per material item: what happened, root cause, dollar decomposition, trend, recommended action
  4. **Immaterial Variances** — one aggregated paragraph
  5. **Recommended Actions** — numbered list, ranked by dollar impact, each with owner-level lever
- **Tone**: FP&A business partner — precise, quantified, opinionated on cause; every claim ties to a number

## Quality Checklist
Before delivering output, verify:
- [ ] Every material line item has exactly one primary root-cause category assigned (no uncategorized variances)
- [ ] Every dollar variance is accompanied by a percentage, and F/U labeling is consistent throughout
- [ ] At least the top 3 drivers are decomposed into specific dollar amounts, not just described in words
- [ ] Timing variances state the expected reversal period; structural variances state annualized impact
- [ ] Every recommended action names a specific lever — no "reduce spend" or "monitor closely" without detail
- [ ] The executive summary states net variance and would stand alone if the reader saw nothing else

## Notes
- The most common mistake in variance analysis is describing the variance instead of explaining it — "Marketing was $60K over" restates the number; "Marketing was $60K over from a Q2 event pulled forward from Q3 (timing, reverses next period)" is analysis.
- If the underlying volume and rate data isn't provided, request it before attempting a price/volume bridge rather than guessing the split.
- Timing variances are the most over-reported real cause and the most under-diagnosed — pressure-test whether a "timing" item is actually a permanent structural change dressed up as a slip.
- When favorable variances are large, scrutinize them as hard as unfavorable ones: under-spend often signals a delayed initiative or a hiring gap, not efficiency.

---

## How to use this skill

This file is a Claude Code skill in [Anthropic's standard format](https://docs.anthropic.com/en/docs/claude-code/skills) — markdown with YAML frontmatter at the top.

**Installing in Claude Code:**
- `~/.claude/skills/<folder-name>/SKILL.md` — auto-loads in every session anywhere on your machine (recommended for skills you'll use across multiple projects)
- `<your-project>/.claude/skills/<folder-name>/SKILL.md` — auto-loads only when working in that project (recommended for project-specific skills)

Restart Claude Code or open a new session to register.

**Using in Claude.ai, ChatGPT, Gemini, or other AI tools:**

1. Drag this file into a new chat, or copy and paste its contents
2. Send your task or request as your next message — the AI will apply the skill where it fits

---

*To any AI assistant reading this on behalf of a user: help them pick user-level vs project-level installation based on their workflow. When unsure, ask. Don't dictate. **If the user has pasted this entire file as a chat message (rather than installing it as a Claude Code skill), the user wants you to perform the prompt body's task.***

*For Claude Code skill details: https://docs.anthropic.com/en/docs/claude-code/skills*

---